Verified record
A 2024 Google reviewer wrote that Parkside Utility Construction was contracted to repave streets after the PWD replaced water pipes in 2013, and that it left the reviewer's driveway at the curb a mess. That 2024 reviewer said they were slapped with a violation because of the company's indifference, and that it did not answer the phone.
They were contracted to repave streets after the PWD replaced water pipes in 2013, they left my driveway at the curb a mess. Because of their indifference I was slapped with a violation, they do not answer the phone.
Specializes in
Languages
1 change recorded — last scanned Oct 4, 2026.