Verified record
“HIC Nos. 141437 and 116928 REMAIN REVOKED”
Languages
1 change recorded — last scanned Sep 30, 2026.
Typical Greater Boston range for this kind of work, from regional averages — not a quote from Sheperd Masonry. Use it to sanity-check bids, then get the real number in writing.
A 12 × 20 patio is 240 sq ft; a 4-ft walkway is 4 sq ft for every foot of length.
Estimated range
$4,500 – $9,000
Typical masonry project around $6,750
Drainage work that kept a garage dry4.2