Verified record
Waterman Paving is a paving company that a berkshireeagle.com article calls a general contractor. It holds 4.5 stars from 24 ratings on Angi, the same on HomeAdvisor, and an A+ grade from the Better Business Bureau. A 2020 customer said Pat told them the driveway would be started on a Tuesday and finished on a Wednesday, and work began at 8am Tuesday and ended at 1pm Wednesday. That 2020 customer called the price very fair. A 2021 reviewer wrote that Patrick and his team paved a very long, steep driveway and also fixed the poor drainage that had damaged the old dirt and gravel one. The work goes past driveways. A 2021 customer said Pat fixed a badly leaking foundation in a 90 year old house and followed up after the next rain storms to fix a few new spots. In that 2021 review, the customer said they later had him build an access road to an unreachable part of the yard and do excavating and cement pouring. A 2022 customer said Mr. Waterman removed a stone wall, graded and paved the area behind their house, then installed a two car steel building as a garage. A 2021 customer said the driveway looked fine when the job was done, but by spring the pavement was "failing apart around the edge of the driveway" and some of it was coming up. That 2021 customer said the asphalt was laid by hand and rolled, leaving roller marks, and that emails and texts to him went unanswered. A 2021 customer said he showed up three weeks after the Tuesday he had promised and did a terrible job.
“It took two days for Waterman Paving, a general contractor, to level the former Beechwood property at 12 South St. in Cheshire.”
We hired Mr. Waterman earlier this year to remove a stone wall, grade and pave the area behind our house. Halfway through this process I asked him about adding a garage. So we agreed that he would install a two car steel building for a garage. To say that he and his crew have done an OUTSTANDING job would be an understatement. Mr. Waterman and his crew not only did an excellent job with the paving but our new garage as well. My wife is ecstatic that she has a warm place to store her car this winter. I would recommend this company for any and all home improvements!!
Extremely unprofessional, unkind, and cannot trust a word that comes out of this man. Said he would be there on a Tuesday- showed up 3 weeks later on a Thursday. Gave us nothing but grief and attitude. Did a terrible job.
Pat fixed a badly leaking foundation in a 90 year old house. He followed up after the next rain storms and fixed the few new spots as well. His attention to detail is the best part. He wants to do the job right. Since then I have also had him do some extensive landscaping, building an access road to a part of the yard that had been unreachable, as well as excavating and pouring cement. Again, outstanding work and attention to detail. Hire him the job will be done right.
My driveway is very long and very steep. When Patrick first gave me his estimate, what was remaining of my dirt/gravel driveway was in very poor condition due to extreme weather damage. Not only did Patrick and his team install a great paved driveway, but they also fixed the poor drainage that caused the damage to the original dirt/gravel driveway. Patrick is a real professional. I wish everyone in today's world cared about their finished work product like he does. From the initial estimate to the end of the job, I cannot speak highly enough of Patrick and his team.
My driveway is very long and very steep. When Patrick first gave me his estimate, what was remaining of my dirt/gravel driveway was in very poor condition due to extreme weather damage. Not only did Patrick and his team install a great paved driveway, but they also fixed the poor drainage that caused the damage to the original dirt/gravel driveway. Patrick is a real professional. I wish everyone in today's world cared about their finished work product like he does. From the initial estimate to the end of the job, I cannot speak highly enough of Patrick and his team.Show moreF S.
Specializes in
Also offers
Languages
1 change recorded — last scanned Oct 10, 2026.
Old blacktop out, new driveway in 2 days3.8