Water-diverting berm against an uphill solar farm3.9
Double driveway prep and paving done in one day4.5
Driveway sealing that cleared a tree-root crack4.2
Stone craftsmanship4.5
Quote names the exact sealcoat product4.0
Double driveway conversion in one day4.0
Stone patio laid on freshly leveled ground4.0
Driveway prepped one day and installed the next4.1
Careful grading and finish on a new driveway4.2
Reasonable price point on a recent job3.8
Owner redid a driveway on his own initiative4.0
Hand-brushed sealcoat3.8
Driveway edging with added dirt and grass seed4.0
Drainage after rain4.1
Driveway cracks and oil stains treated4.1
Cracked driveway sealcoated to look almost new3.9
Careful driveway sealcoating work3.9
Driveway crack filled first, then sealed4.1
Boulders cleared from a driveway before paving3.8
Hot-tar crack filling on larger driveway cracks3.7
Same-day visit to give an estimate3.8
40 years in business3.5
Driveway puddle gone after two rain storms3.9
Driveway done the same day, cleanly3.3
Sealcoating planned around the week's weather3.5
Richard returned the next day to check his work3.7
Sealcoated two driveways with close attention to detail3.8
2 large driveway cracks refilled at no charge4.0
Driveways done in days3.4
Two driveways left looking brand new3.8
Callback within 20 minutes3.9
Hired three times in four years by one customer4.1
Box vent leak repaired on the spot3.9
Work still very stable 18 months on2.9
Paver patio makeover around intricate spots3.5
Crack filling done before the driveway is sealed3.3
Grading preparation for a driveway repave4.2
Driveway sealing done by hand, no spray3.7
Root-damaged driveway ripped up and repaved in two days3.8
New driveway installed within 6 hours4.0
Old driveway torn out and replaced3.9
Praised for patios, pavers and retaining walls3.9
30-year-old driveway sealcoated to look like new3.2
Stamped asphalt driveway sealed when others hesitated3.6
No deposit needed until the job was done3.4
Driveway sealed without touching the cobblestones3.8
Neglected driveway sealed crisp and clean3.6
Driveway resurfaced within three days of the quote3.3
Redone driveway that looked great3.1
French drain stopped a customer's basement flooding4.0
Driveway on schedule3.6
A six-month-old quote still honored2.7
Replaced a 2025 customer's septic system3.7
Root-damaged driveway replaced3.5
Good price from the owner on a driveway seal3.5
Walkway layout help alongside the driveway3.2
Owner John on site for all paving work3.3
Driveway drainage concerns fixed3.4
Portsmouth dog park extension paved on budget3.2
Museum walkway paving done in two days2.8
60 of 93 results shown