Water-diverting berm against an uphill solar farm3.9
Double driveway prep and paving done in one day4.5
Driveway sealing that cleared a tree-root crack4.2
Stone craftsmanship4.5
Quote names the exact sealcoat product4.0
Double driveway conversion in one day4.0
Stone patio laid on freshly leveled ground4.0
Driveway prepped one day and installed the next4.1
Reasonable price point on a recent job3.8
Driveway edging with added dirt and grass seed4.0
Careful grading and finish on a new driveway4.2
Owner redid a driveway on his own initiative4.0
Hand-brushed sealcoat3.8
Drainage after rain4.1
Careful driveway sealcoating work3.9
Cracked driveway sealcoated to look almost new3.9
40 years in business3.5
Same-day visit to give an estimate3.8
Boulders cleared from a driveway before paving3.8
Hot-tar crack filling on larger driveway cracks3.7
Driveway puddle gone after two rain storms3.9
Driveway done the same day, cleanly3.3
Sealcoating planned around the week's weather3.5
2 large driveway cracks refilled at no charge4.0
Sealcoated two driveways with close attention to detail3.8
Richard returned the next day to check his work3.7
Driveways done in days3.4
Two driveways left looking brand new3.8
Hired three times in four years by one customer4.1
Box vent leak repaired on the spot3.9
Callback within 20 minutes3.9
Work still very stable 18 months on2.9
Paver patio makeover around intricate spots3.5
30-year-old driveway sealcoated to look like new3.2
Praised for patios, pavers and retaining walls3.9
Crack filling done before the driveway is sealed3.3
New driveway installed within 6 hours4.0
Driveway sealing done by hand, no spray3.7
Root-damaged driveway ripped up and repaved in two days3.8
Stamped asphalt driveway sealed when others hesitated3.6
Old driveway torn out and replaced3.9
Driveway resurfaced within three days of the quote3.3
No deposit needed until the job was done3.4
Driveway sealed without touching the cobblestones3.8
Neglected driveway sealed crisp and clean3.6
French drain stopped a customer's basement flooding4.0
Redone driveway that looked great3.1
Driveway on schedule3.6
A six-month-old quote still honored2.7
Replaced a 2025 customer's septic system3.7
Good price from the owner on a driveway seal3.5
Driveway drainage concerns fixed3.4
Root-damaged driveway replaced3.5
Walkway layout help alongside the driveway3.2
Portsmouth dog park extension paved on budget3.2
Water run-off suggestions that worked3.0
Museum walkway paving done in two days2.8
Two driveways paved in a single day3.1
25 years in business3.2
Reasonable price, per a 2022 Reddit commenter3.6
60 of 88 results shown