Neglected driveway sealed crisp and clean3.6
Driveway sealing that cleared a tree-root crack4.2
Driveway prepped one day and installed the next4.1
Quote names the exact sealcoat product4.0
Double driveway conversion in one day4.0
Careful grading and finish on a new driveway4.2
Stone patio laid on freshly leveled ground4.0
Owner redid a driveway on his own initiative4.0
Hand-brushed sealcoat3.8
Drainage after rain4.1
Two driveways left looking brand new3.8
Same-day visit to give an estimate3.8
Driveway done the same day, cleanly3.3
Root-damaged driveway replaced3.5
Hot-tar crack filling on larger driveway cracks3.7
Retaining wall rebuilt at a very fair price3.0
Driveway puddle gone after two rain storms3.9
Cracked driveway sealcoated to look almost new3.9
Boulders cleared from a driveway before paving3.8
Root-damaged driveway ripped up and repaved in two days3.8
Callback within 20 minutes3.9
Walkway layout help alongside the driveway3.2
Crack filling done before the driveway is sealed3.3
Driveway sealed without touching the cobblestones3.8
Old driveway torn out and replaced3.9
Richard returned the next day to check his work3.7
No deposit needed until the job was done3.4
Returned to redo a driveway when asked3.9
Driveway sealing done by hand, no spray3.7
Water-diverting berm against an uphill solar farm3.9
Sealant sprayed on a millings driveway3.8
French drain stopped a customer's basement flooding4.0
Work still very stable 18 months on2.9
Driveway redo after rainstorm3.8
Driveway coating hand brushed by Anthony3.9
Replaced a 2025 customer's septic system3.7
Sealcoating that left a driveway looking brand new3.9
25 years in business3.2
Repeat driveway sealing with no issues3.2
Parking lot finished in three days3.6
Sealcoating planned around the week's weather3.5
Portsmouth dog park extension paved on budget3.2
Rain-damaged driveway resealed the next business day3.6
Museum walkway paving done in two days2.8
Box vent leak repaired on the spot3.9
Driveway on schedule3.6
Reasonable price, per a 2022 Reddit commenter3.6
Surface repairs thanked by bikenewportri.org3.5
Redone driveway that looked great3.1
Paver patio makeover around intricate spots3.5
53 years in business2.4
30 years in business2.7
Root-damaged driveway excavated and re-done3.0
New driveway within 3 days2.4
20 years in business3.7
28 years in business3.4
A 100x200-foot driveway paved2.5
Driveway, bluestone walks and gardens in one job3.7
125 years in business2.1
32 years in business3.0
60 of 66 results shown