Verified record
Typical Greater Boston range for this kind of work, from regional averages — not a quote from A-Z Finish Carpentry. Use it to sanity-check bids, then get the real number in writing.
A typical single-level deck is 12×16 — about 200 sq ft.
Estimated range
$7,750 – $14,500
Typical carpentry project around $11,100
A-Z Finish Carpentry is a Winthrop-based finish carpentry and general contracting company run by owner and project manager Charles Draleau, with Edward Mulrenin as lead carpenter, working on kitchens, bathrooms, basements, ADUs, decks, tile and custom woodwork across Boston and the North Shore. The company says it has been at it for 15 years; its Massachusetts Home Improvement Contractor registration #203042 is verified active in the state registry, the Better Business Bureau also lists a Construction Supervisor licence CS-116683 expiring in 2027, and it holds an A+ grade with accreditation there. Most of the people who write about them hired them for a full bathroom or kitchen remodel. In March 2026 one homeowner described Charles arriving promptly to assess a kitchen and explaining the process clearly, and another credited Samantha with patiently turning a stream of ideas and questions into the bathroom she pictured. A January 2026 Thumbtack reviewer had a kitchen and two bathrooms remodeled and called the craftsmanship top-notch. Earlier accounts fill in the detail: a 2023 kitchen gut with a wall removed between kitchen and living room finished in about a month and a half; a 2023 bathroom whose missing venting, flies and smells were diagnosed and fixed along with old plumbing and a widened entryway; a 2024 bathroom added to an 1840s house to prepare it for sale, with the owner helped to control costs; and a same-day visit in 2024 with a 3D kitchen draft in hand. Two names recur. Charles is described as a skilled carpenter who keeps jobs on schedule and offers honest opinions on which ideas will work, and Samantha, the project manager, is thanked repeatedly for being reachable and answering endless questions. The tile setter, Manny, is singled out in 2023 and 2024 reviews as an artist. Reviewers also mention the team coordinating the plumber, electrician and waste removal, and recommending where to buy materials. Two women homeowners wrote in 2023 that they felt safe with the crew in the house, and a 2024 reviewer valued having a female project manager. Angi reviewers from 2023 describe larger jobs, including a walkout basement rebuilt after mold and asbestos remediation and a remodel of three bathrooms, two bedrooms and a laundry room. The written record is almost uniformly positive: Google shows 5 stars from 33 ratings, Thumbtack 4.7 from 30, HomeAdvisor 4.9 from 7 and Houzz 5.0 from 1. The one softer note is a December 2024 four-star review that mentions a small misunderstanding at the end of the job, which the reviewer says A-Z worked through with them. For a Boston or North Shore homeowner planning a bathroom or kitchen gut, an added bath, or a basement build-out, this is a well-documented choice; ask up front how change orders and end-of-job adjustments are handled, and confirm who your day-to-day project manager will be.
Our front door was badly damaged during an evacuation due to a neighboring fire. I first considered changing the door, but preferred to have it repaired since it's original to the house. I wasn't sure it cold be repaired, but Jacquson replaced the glass and moldings, and consolidated the door around the locks where it had been damaged. We are very happy with the results, and we are happy that we could keep the original door!
Had such a great experience working with A-Z! Samantha, Charles, and the whole team were very responsive. Samantha especially was so helpful in making our bathroom look the way I imagined it, and was very patient with my impossible ideas and a million questions. :) I'm very happy with the end result and with the way the entire project was managed. I can't recommend them highly enough! Thanks, guys!
I couldn’t have asked for a better company than A-Z for my kitchen remodel! From the get go, Charles arrived promptly to assess the space for my estimate and I felt immediately comfortable that this was the company to work with based on his knowledge and ability to explain the project to me. From there, I met with Samantha, the project manager. I can’t say enough about how wonderful she was to work with and explained everything to me fully. I had roughly 600 questions for her at all times during the process and she always got back to me and answered all of them thoroughly. I had no experience in home improvement work before this and without Samantha, I truly don’t know what I would have done. All the workers who came out for the different portions of the project were wonderful as well and always arrived right on time. I will 100% use them going forward with any home projects that come up, and will be recommending them to friends and family who are looking for work to be done!
We had an excellent experience with A-to-Z Finish Carpentry. They remodeled our kitchen and two of our bathrooms, and the results are absolutely beautiful. From start to finish, the team was professional, communicative, and detail-oriented. The craftsmanship is top-notch, the spaces are both functional and stunning, and everything was completed on schedule. We couldn’t be happier with the final results and would highly recommend A-to-Z Finish Carpentry to anyone looking for high-quality remodeling work.
I had a great experience with A-Z Finish Carpentry for my bathroom renovation last year. From start to finish Charles and Samantha were very professional and responsive throughout the process. Samantha, the project manager was really helpful in answering my endless questions. They completely transformed my space and even completed the project on a relatively fast timeline. This was really appreciated since it was my only bathroom and during the dead of winter. The work was excellent and I’d definitely work with them again.
Specializes in
Also offers
Service area
Languages
1 change recorded — last scanned Jul 17, 2026.
On time, on budget2.8
Structural fixes3.1
Crew worked 12-hour days in a heat wave3.5