Verified record
A 2018 customer said John and his crew laid coverings for wood flooring and carpeting the day before bathroom work was due to begin. The 2018 customer praised the quality of the work and John's attention to detail. A 2016 customer said John put in a second toilet upstairs, painted old radiators and changed light fixtures. A 2014 customer said John's team remodeled a bathroom and that John installed a door-stop and painted scratched spots on a door while waiting for parts. A 2020 customer said the house looked clean at the end of the day and that all workers wore masks and kept a safe distance. A 2019 customer said work was completed on time and at the agreed price. A 2020 customer described inconsistent bathroom-remodeling work: good tile work and glazing, substandard wallpapering, poor planning for new plumbing, and subcontractors the customer called dishonest and prone to cutting corners. The 2020 customer said work remained incomplete, the shower was unusable, and the general contractor broke promises and did not return calls.
These were the most respectful and professional contractors I have ever hired. I felt my wants and desires were important to them. I was never told no we canâ t do that I was told letâ s see if we can make this happen. I can not stress how clean they were. My house looked great at the end of the day,. What was most important to me doing a project during Covid was the safety of my family. All their workers kept a safe distance and everyone wore a mask.
The proprietor is extremely knowledgeable in the area of bathroom remodeling. He provided us with several options for how to approach the remodeling project. The quality of work was inconsistent. Good tile work and glazing followed by substandard wall papering, awful anticipation of the best way to install new plumbing, dishonest and corner cutting subcontractors, and an overall awful experience. What commenced as an optimistic outlook for replacing an outdated bathroom (in July) has evolved to the point where the work is still incomplete, the bathroom shower is unusable, the GC is breaking promises and won't return calls, and I' m now forced to hire professionals to complete the remaining work. Siphon the ideas and quotes from this company and hire someone else to carry out the work!
Work was done in time and in the price that we where agree off
Excellent communication by owner.... great quality, realistic timelines and overall great results (so far, project not done!)
He was excellent, always checking the work to make sure that everything was right. Also very very professional.
Specializes in
Also offers
Languages
2 changes recorded — last scanned Sep 23, 2026.
Typical Greater Boston range for this kind of work, from regional averages — not a quote from Bathz. Use it to sanity-check bids, then get the real number in writing.
Upgrades beyond the standard like-for-like swap included in the base scope.
Estimated range
$27,500 – $45,000
Typical bathroom remodel around $36,300
Tile craftsmanship5.0
Brings finish samples on site and reworks plans5.0
Clients returning for 10 and 20 years5.0
Detailed craftsmanship5.0
Load-bearing wall removals5.0