Fiorani Construction Corporation describes its offer as kitchen and bathroom remodeling. A 2021 customer praised the removal of an old one-piece enclosure and installation of a jacuzzi tub and subway tile. A 2021 customer said they were kept up to date each day, received help with ideas and were pleased with a new bathroom and office storage area. A 2025 customer said a bathroom shower leaked into the basement and had to be completely demolished to have it redone correctly. A 2023 customer said Fiorani remodeled the kitchen but left gaps between new cabinets and the wall, separating floors and chipping tile grout; the customer also said a plastic refrigerator tube broke overnight and flooded the basement. A 2023 customer said the project took more than six months longer than estimated and ended because they concluded the company was unwilling or unable to finish. The 2023 customer said wall tiling was misaligned, poorly grouted or ungrouted, and included wrong-color tiles; they had to ask new contractors to fix it. A 2023 customer who hired Fiorani to remodel an unfinished basement said contracted baseboard heating was never installed, vinyl flooring was uneven and lifting, and cabinets and shelves remained unfinished or missing. That 2023 customer said the garbage disposal was incorrectly installed, corroding and covered in mold, while praising the electrician working for Luiz for responding quickly and coming to fix problems. Massachusetts lists its home improvement contractor registration, 201139, as expired.
Had my bathroom done in 2022. The shower wasn?t done correctly and leaked into the basement and had to be completely demolished to pay to have it done correctly. He did bad work for my sister as well, not properly supporting a deck.
Worst company ever!! They remodeled my kitchen in 2021 and I am still finding multiple errors! These people do not know what theyâ re doing. I just had blown in insulation on the outside of my house from Mass Save and Fiorani did not close the gaps between the new cabinets they installed and the wall! Needless to say insulation flew everywhere in my kitchen due to Fioraniâ s horrible work! My floors are separating, they left trash on top on the cabinets, grout on the tiles have been chipping off. They installed a plastic tube to my refrigerator that says right on it â DO NOT USE AS WATER LINEâ and needless to say it broke and I had a flood in my basement as it broke overnight. Louis was absolutely horrible and I will never recommend him to anyone! Horrible work all around do not waste your time and money on this joke of a business.
Unfortunately, we did not have a good experience with this provider and cannot in good faith recommend Fiorani Construction.
Our project took more than six months longer than estimated and ultimately ended because we concluded that the company was unwilling or unable to finish the project. Our experience with Luiz mirrors that of reviewer Ariana L. below--for weeks or months on end, only one worker came for a couple of hours a day (who would often make no perceivable progress) or no one would come at all. Although we would often text daily to ask whether anyone would be coming by, our texts were frequently ignored or received a perfunctory yes after which no one would show. The tiling on the walls (while admittedly a complicated chevron pattern) was done so poorly (misaligned, poorly grouted or not grouted at all, wrong color tiles put up even after we pointed out the issue) that we had to ask new contractors to fix it, and it seems like it will cost nearly as much as redoing the project to fix. There are also just a huge number of seemingly lazy or careless errors, like that they forgot to seal the outside of the shower where it meets the floor. While this company is capable of doing acceptable work at an acceptable cost, they seem incapable of telling a client when a project is outside their skill set. I do not recommend using them for anything but the most basic of projects. Just an extremely frustrating and draining process.
We used Fiorani Construction to remodel our unfinished basement. We were first quoted 7 weeks and it took longer which is not the biggest issue. I understand there is a supply issue and people get sick but for weeks on end, there would only be one worker coming every day for hours and that made things slowly than they had to be. We went with Luiz and his crew because of the timely manner they said they would be done and the price. They were the cheapest quote we got and reviews/photos online said they were nothing but the best. We would text daily to see if anyone was coming by so we could leave the door unlocked. Sometimes we would get an answer and nobody would ever show up. My biggest issue is and was sticking to the contract & the quality of the work. We had no heat on half of the basement due to it being unfinished the contract clearly stated baseboard heating and which was never installed but instead, when we mentioned it we had an electrical heating system put in. The vinyl flooring was not installed correctly so it is all unlevel and in some areas, the planks are lifting away from the other. My kitchen cabinets were never finished, and shelves were never put in or just missing altogether. I had to hunt down the name of the cabinets and order shelves from them to install myself. An unfinished painted area like on my stairs. Unfinished updating of electrical outlets, just replacing the covers and smoothing away the unfinished drywall. My tub they installed was never caulked, so I will have to replace I am sure my entire bathroom due to water damage behind my tub. My garbage disposal was not installed correctly and has been rotting and corroding away for this entire year I have noticed a putrid smell, well it is that, and it is covered in mold and disintegrating. Areas of patchwork that have never been covered or painted over. Issues with my bathroom plumbing - the shower will leak and leak out behind the wall flooding my bathroom floor. I instructed and was told it would be taken care of when it came to my outdated and original drum from the upstairs bathroom that leaked in the house before remodeling and he never took care of it. I found out by having my ceilings ruined from it leaking all over brand-new construction. There is plenty of issues. It is just lazy work and cosmetically looks great but it is not great work. I have reached out so many times about someone coming by. I am always told someone will and they never come.. this has happened COUNTLESS times where I wait all day for someone and nobody ever shows. I got this work done in Dec 2021-Feb 2022. This all happened well into the first few months of the remodel.. nothing new. I will say the electrician that works for Luiz is wonderful. Always friendly, responds quickly, and will come asap to fix whatever. The plumber is alright as well, he did make a comment as to how Luiz should have never put vinyl flooring in the bathroom but we will just add that to the ongoing list of issues.
Specializes in
Also offers
Languages
2 changes recorded — last scanned Sep 23, 2026.
Typical Greater Boston range for this kind of work, from regional averages — not a quote from Fiorani Construction Corporation. Use it to sanity-check bids, then get the real number in writing.
Estimated range
$23,000 – $35,000
Typical remodeling project around $29,000
Built a garage with a bonus room, kitchen and bath4.6
Detail-oriented craftsmanship4.3