Returned a year later to fix cracking at no charge4.0
Project detail4.4
Tree roots dug out before a new asphalt driveway4.5
Large driveway cracks cleaned out and sealed4.5
Custom pours4.8
Entrance drain and backyard water fixes3.6
Drainage installs that fixed flooding and puddling4.8
Sealcoat redone next morning after overnight rain4.1
Retaining-wall project with permit questions worked through4.6
$5.3k quoted for a 430 sq ft driveway4.0
Technical patio work4.9
Sealant kept off walkways and patios4.3
Driveway completed in about five hours3.8
Clean, precise driveway paving3.5
Clean sealcoat edges3.7
Old driveway replaced in half a day4.0
Crosswalks that outlasted the roadway4.7
Trenching that left a bluestone patio intact3.9
Retaining wall rebuilt with geogrid support5.0
Tim hired a painter to re-paint the garage door3.6
Built 2 retaining walls and a pathway4.4
Two-visit paving plan so the sub-base could dry3.7
Driveway prep before the seal coat3.9
Nick explained the process and answered questions3.7
Cracks sealed and primer applied before coating3.8
Driveway edging along stone walls and a trench drain3.9
Sinking-driveway repair with a rebuilt base4.4
Driveway sealcoated three days after first contact3.8
Driveway aftercare3.2
Court resurfacing4.0
BBB A+, accredited3.1
Retaining wall drainage3.7
Driveway drainage without winter pooling3.6
Sealcoat finish that held up for years3.3
Paving crew blended the seams3.5
Driveway drainage3.3
Ledge chipped out and leveled for a new driveway3.8
Prep, crack fill and edge cutting before sealing3.1
Driveway graded and paved on time3.8
Pricing honored3.8
Detailed prep praised by a repeat customer3.7
Paver patios and pool coping praised for speed and value4.0
Driveway paving over gravel under two asphalt layers2.7
Verified drainlayer license2.2
Four days of driveway prep and boulder removal3.2
Careful site work3.3
Driveway and retaining wall at a reasonable price2.9
Driveway paving quality2.8
Competitive estimate3.1
Pathway team sent the next day4.6
Old driveway removed and repaved the next day3.5
Patio jobs described by customers in 2023 and 20253.7
Driveway job3.0
Driveway and parking-lot sealcoating3.0
112 years in business2.6
Retaining wall finished in three days4.4
21 years in business2.6
Granite treads replacing split bluestone steps4.3
Pool patio3.7
Skilled hardscape work3.6
60 of 93 results shown