Chalky siding residue cleared by hand4.4
A restored patio after moss-and-weed cleanup4.4
Pontoon boat repair in under a week3.6
Deck wood repair finished with new steps4.0
Years of buildup off siding, decks and roofs5.0
A house wash finished in one day by Billy4.7
House, gutters and roof washed on one job4.6
A firm quote within 48 hours4.5
Cedar surface care without damaged wood4.7
500-gallon underground tank removed and replaced4.6
Popcorn ceiling removal and painting5.0
Window calcification removal left the glass clearer4.4
10-day shower door turnaround3.7
Deck preparation with sanding, scraping and vacuuming4.7
Deck wash that revisits difficult areas4.1
Countertops designed to installed in under three weeks4.7
Two badly weathered decks prepped and painted4.1
RV step repair with a quick turnaround4.4
Soft wash that kept the paint on painted cedar shakes4.4
All four fire pit legs replaced3.7
Handmade soapstone sink with kitchen counters4.7
Repair cleanup after ceiling drywall work3.6
Careful around windows, checking each before washing3.6
Garage roof moss cleared in a day4.4
Soft washing3.9
Gutter brightening3.7
Skylight replaced with the ceiling texture matched4.9
House washing to remove exterior mold4.3
Leak-damaged ceiling texture matched completely3.7
Fire escapes, gates, custom-matched railings4.4
Skylight glass replacement3.5
Removable railing custom-designed for icy steps3.7
Cabinets delivered and installed on time3.3
Dryer vent cleaning done alongside the duct cleaning4.3
Basement structural supports installed by Bill4.2
Soft washing that spares siding from damage3.7
Yard cleanup done in a single day3.9
Truck fabrication3.9
Drywall joints still invisible after 16 years3.3
No up-charges for sink cutouts and edges4.2
20-year-old house power washed to look new3.7
Ceiling repair from sheetrock to paint4.3
Gutter guards4.4
Quick powder-coat turnaround on a trailer frame4.0
Mold remediation4.0
Six chimney jobs documented since 20163.6
Power settings chosen to protect siding and trim4.1
Same-day dryer vent cleaning3.9
Work-truck frame repaired with reinforcement plates3.4
Wood stove part fabricated in under a week3.3
Front stairs rebuilt and brick steps repaired4.1
Custom basement hatch frame, design improved by the owner3.8
Aluminum mast casting welded while the customer waited3.8
Consistently smooth finish4.0
Riding mower deck welded and returned in about 2 days3.8
Ceiling texture blending3.8
Dryer vent inspection before cleaning3.5
Custom steel gate3.7
Estimate matched the final price4.0
Bedroom skim coat left the walls looking much better3.1
60 of 180 results shown