Asbestos removed from floors, ceilings and a rectory4.7
Arrived within 30 minutes on a fire night3.9
Radon cut from 7 to 1.30 pCi/L in 8 hours4.0
Attic mold fixed and bath vents rerouted through the roof3.8
Radon readings dropped to near zero5.0
In-house crews, no subcontractors4.6
You’ve seen all 6 remediation contractors seen on Reddit
6 of 6 results shown