Verified record
A homeowner signed with Devlin Energy in late April 2025 and was still waiting that November. First the system they had been sold turned out to be one National Grid would not support, so the plan had to be redrawn; then the interconnection application went in wrong, costing three more months. Another customer, writing in March 2025, spent months researching local installers and built a spreadsheet to compare them before choosing Devlin, and said their salesman Jon kept the whole job moving from start to finish. Devlin is a Hingham solar company: residential and commercial arrays, ground mounts, battery storage, EV chargers and solar-with-roof projects across New England. It describes itself as family-owned and says it has put in more than 7,000 systems over the past decade, and it lists Tesla Certified Installer status. Its BBB profile is accredited with an A+ grade. On Google it averages 3.9 stars across 76 ratings. The sale and the installation itself draw the warmest accounts, usually by name — Kyle, Jon, Andy, Sean, Kim, Matthew. Customers writing in 2023 and 2024 describe pitches with no pressure, written proposals detailed enough to compare against other bids, several options rather than one, and crews who worked tidily and left the yard clean. A homeowner who collected multiple quotes in the fall of 2022 picked Devlin for its components and the quality of the install at a competitive, though not the lowest, price. One in February 2024 valued that sales, installation and service all sat in one company rather than three. What goes wrong tends to go wrong afterwards. In August 2024 a customer wrote that a large ground-mount system took close to a year from signed contract to built array. Another that month said the system was undersized and that when an inverter failed, Devlin supplied the part but wanted $425 to send a truck. In September 2022 a customer was told two weeks before installation that three more panels were needed, at $7,000 above the agreed price. Getting hold of service comes up repeatedly: one customer in September 2022 spent over a month trying to book an appointment with no reply to voicemails or emails, and another in September 2023 said a system 18 months old had worked properly for maybe three or four of those months. A 2024 review described an array that did not shut down when the utility cut power for work, after which the power company locked it off. Some of those stories end better than they start. A customer who had left one star updated it in March 2024 to say Matthew Devlin reached out, took the complaint seriously and made it right, with an apology from the salesperson. Another whose panels had stopped reporting production updated in May 2023 to say someone finally helped and all of them were working again. A reviewer in April 2024 had problems after installation, said they were resolved promptly, and still counted the deal a good one against competing bids. If you go ahead, get the after-sale in writing: who files the interconnection paperwork and what happens if the utility rejects it, what a service visit costs once the system is live and whether a truck charge applies, and a panel count and price that are fixed at signing. Those are the points where it went wrong for the customers who were unhappy.
“Devlin Energy”
“A happy homeowner recently turned to Devlin Energy after their contract was cancelled last summer”
“said Thomas Janoski, director of engineering for Devlin Energy in Hingham”
“Contracting and maintenance firm delivering solar energy to New England by maintaining partnerships with solar equipment manufacturers.”
“DEVLIN ENERGY has had 1 OSHA inspection since Jan 30, 2025, resulting in 1 violation and $2,500 in penalties on record.”
“Plaintiff Deborah Schrider (“Plaintiff”) filed this lawsuit against her former employers, Devlin Contracting and Maintenance, Inc. (“Devlin Contracting”), Devlin Solar, Inc. (“Devlin Solar”), Matthew Devlin, Brian Devlin, and Cindy Ingemi”
I have been waiting for my system since late April 2025. At first there were manny delays because of devlin selling me a system that national grid would not support. Revised system plan was done, then the interconnected applications wasn’t filled out properly 3 months delayed here. It’s now November 2025, installation was supposed to happen on 11/20/2025, didn’t happen. They told me to dig trench from where the batteries were going to the house across the driveway. I explained I can’t have the driveway blocked as is critical to get in and out. Tech told me they will be back first thing in the morning, morning came no one showed up. I called my representative he stated that they would be back the following week, lost my mind with a trench dug up, driveway impassable. Spoke to Cindy from devlin who said she could get somebody to come Friday (3 days later) to do the electric conduit and close the trench. Which was done. Now 3 weeks later (11/24/2025) still waiting on proper roof brackets. Escalated to Cindy office manager/vp getting the BS responses or ghosted text messages being ignored. I don’t understand how this company is still in business If I don’t get a response today, I’m going to call the better business bureau to file a complaint and TV station to do on air TV report on Devlin business practices. My patients is running out!
I purchased a Solar System From Devlin in 2020 which was not a great experience and This year We noticed a panel was under performing. I reached out to the service team (Brian) and he replied quickly saying he would have Enphase reset the MI. I reached out again and he said he would check to see if they had done the reset. I reached out again and he ghosted me. (3/3/2025 Initial email) I started calling the service department to try to get a hold of someone to take care of my issue. Farley told me he would ask and they should be back to me soon. 6/2/2025 after multiple calls to the service department I got an email from Brian saying my system was fine and a bunch or reports saying that it was producing. I replied that It was stated it was the panel and that he would add Seth to get a warranty claim started with CertainTeed 7/1/2025 I emailed the group email asking if there was an update and they replied saying they will ask CertainTeed again if there is an update. 7/10/2025 CertainTeed sends email saying they have opened a claim and that Devlin should send out a crew to check the panel 8/2025 I exchanged emails with CertainTeed about if Devlin had contacted them and they had not heard. I called multiple times and the CertainTeed Rep contacted them as well. 9/2/2025 Devlin Emails me saying 2 service reps are on their way out in 2 hours to look at the panel. I have sent emails to the CertainTeed rep asking if they gave any information from the crew coming out and she said none. I called Devlin again and they said a separate crew needs to come out to "Rectify the issue." I have called a few more times and have gotten the standard" I will reach out to the Service team" from Farley. So I am going on 8 Months now I would not recommend this company
In 2023, we decided to look into using solar energy for our house. After a lot of careful research and comparing different options available to us, we settled on Devlin Energy. And we are very happy we did. There were some delays in getting the project started, but once it began we were very pleased with the work and the professionalism of the crew. Admittedly, we were skeptical about the benefits of solar energy in regards to savings, but after almost 2 years, our concerns have been satisfied. And the back up battery system works very well. There have been several times it has been needed, and we didn’t know the power in our area was off, it was that seamless. For us, Devlin Energy was the right choice. And we would recommend them for anyone considering converting to solar energy. Don and Missy S.
Devlin`s installation crew was great very professional courteous and neat.
From the beginning of our solar journey, Jon from Devlin Energy was not just a skilled salesman, but also a reliable professional who made sure everything went smoothly from start to finish. We spent months researching local companies and even created a spreadsheet to compare options, thinking we already knew the best solution for our large solar project. However, after meeting Jon, we realized we were missing out on a superior product, better warranties, and a local solar loan option. Jon provided clear and informative communication throughout the entire process, explaining expectations, timelines, and what we could expect from the installation. Even after the system was installed, he continued to follow up to ensure everything was in place. The installation team was equally professional, getting the system up and running with ease. The solar system not only functions perfectly but looks aesthetically pleasing as well. While we are still waiting for the final inspections before turning it on, we are confident the system will work as expected. Despite some negative reviews we've seen, we found those to be explainable and unrelated to the service from Devlin Energy. Based on our experience, we highly recommend Jon and the entire team at Devlin for anyone considering solar. They’ve exceeded our expectations and truly stand out in the industry.
Specializes in
Also offers
Service area
Languages
Ownership
Certified attributes are verified against the public registry. Others are the business's own statement.
1 change recorded — last scanned Aug 16, 2026.
Quoted price matched the bill3.7