Verified record
In a September 2026 Google review, a customer whose pool had tiles falling off and was leaking water wrote that they were referred to Greg when others were unable to take on another job. Greg assessed the situation and developed a plan; access was the biggest challenge, since the pool is surrounded by a concrete wall. The reviewer wrote that he and his team rebuilt the pool and fixed components that were improper, and that you can't even tell where the hole was in the wall for the excavator and skid steer to reach the pool deck. G S Rose Construction is based on Flanders Road in East Hampton and says it has been in business for 41 years. Its site lists pool and spa repair, resurfacing and replastering, gunite pool and spa construction, tile repair and replacement, and pool decks and water features, with a stated service area running from Greenwich, Stamford and Westport to Hartford, Glastonbury and Farmington. Its Connecticut home improvement contractor registration, HIC.0576618, is active on the state registry under G S ROSE CONSTRUCTION.
We were referred to Greg when others were unable to take on another job. Our pool was in need of rehabilitation with tiles falling off and leaking water. Greg came and assessed the situation and developed a plan. Access was perhaps the biggest challenge in our project, as our pool is surrounded by a concrete wall. Greg's excellent problem solving and creativity made the job possible. He and his team rebuilt the pool and fixed components that were improper. His attention to detail left us with a spectacular result. You can't even tell where the hole was in the wall for the excavator and skid steer to access the pool deck.
Specializes in
Also offers
Service area
Languages
1 change recorded — last scanned Oct 30, 2026.
Typical Connecticut range for this kind of work, from regional averages — not a quote from G S Rose Construction. Use it to sanity-check bids, then get the real number in writing.
Estimated range
$280 – $560
Typical pool service visit around $420
Pool liner swapped in just over 7 hours4.8
Pool build finished in under 2 weeks4.5