Customers return for sealcoating years after paving
About 362 feet of driveway removed and repaved3.8
Quote names the exact sealcoat product4.1
Driveway sealing that cleared a tree-root crack4.4
Driveway prepped one day and installed the next4.3
Hand-brushed sealcoat3.8
Drainage after rain4.1
Family-name concrete sections cut out and saved4.0
Careful grading and finish on a new driveway4.2
Same-day visit to give an estimate3.8
Driveway done the same day, cleanly3.3
Stone patio and sealed brick steps4.1
Neglected driveway sealed crisp and clean3.6
Owner redid a driveway on his own initiative4.0
Permit paperwork handled with the health district4.2
Two driveways left looking brand new3.8
Hot-tar crack filling on larger driveway cracks3.7
Cracked driveway sealcoated to look almost new3.9
Root-damaged driveway replaced3.5
Driveway puddle gone after two rain storms3.9
Boulders cleared from a driveway before paving3.8
Retaining wall rebuilt at a very fair price3.2
Return call within 20 minutes4.3
French drain stopped a customer's basement flooding4.0
Water-diverting berm against an uphill solar farm3.9
Septic system replacement3.7
Richard returned the next day to check his work3.7
Crack filling done before the driveway is sealed3.3
Root-damaged driveway ripped up and repaved in two days3.8
No deposit needed until the job was done3.4
Every driveway crack filled and sealed3.4
Old driveway torn out and replaced3.9
Driveway sealed without touching the cobblestones3.8
Work still very stable 18 months on2.9
Driveway sealing done by hand, no spray3.7
Redone driveway that looked great3.1
25 years in business3.2
Sealcoating planned around the week's weather3.5
Reasonable price point on a recent job3.8
Repeat driveway sealing with no issues3.2
Museum walkway paving done in two days2.8
Portsmouth dog park extension paved on budget3.2
A six-month-old quote still honored2.7
Parking lot finished in three days3.6
Driveways done in days3.4
Box vent leak repaired on the spot3.8
600-foot driveway replacement3.0
Paver patio makeover around intricate spots3.5
Reasonable price, per a 2022 Reddit commenter3.6
Driveway on schedule3.6
28 years in business3.4
Driveway resurfaced within three days of the quote3.3
53 years in business2.4
Surface repairs thanked by bikenewportri.org3.5
Praised for patios, pavers and retaining walls3.9
Driveway paving a 2024 customer was very happy with2.7
Root-damaged driveway excavated and re-done3.0
20 years in business3.7
Driveway, bluestone walks and gardens in one job3.7
Quick quote for driveway sealing2.3
60 of 72 results shown