Permitted apron dig right to the road3.1
Tile roof washed clear of moss4.0
Mentioned 1× on Reddit2.1
Driveway pitch that handled several rain storms4.8
Driveway pitched to end water pooling4.5
Driveway graded so rain water runs into the drain3.9
Ground left a month to settle before paving2.7
Old asphalt recycled into the new driveway base3.7
Driveway grading that stopped pooling and runoff3.2
Whole driveway replaced, done by 3:00pm3.9
Driveway still in good condition after 37 years2.4
Ice-dam leak fixed the same day before a blizzard3.9
Told patching would do, not a new driveway4.2
You’ve seen all 13 paving contractors seen on Reddit
13 of 13 results shown