Tub and shower swaps done in a day3.4
Luis arrived within an hour4.9
Popcorn ceilings removed and repainted4.7
Drywall finish praised by other contractors4.1
22 windows installed and sided4.3
Old-house bathroom work4.3
Flood and water-damage rebuilds4.3
Addition enclosed in about a month4.1
Just about an entire home renovated4.3
Kitchen-and-bath gut renovation4.3
Pitched and flat roofs replaced4.5
Bath and kitchen remodels3.5
Roof leak found and fixed by Ed4.4
60 of 171 results shown