Verified record
Olson Electric Development Co is a Methuen electrical and general engineering contractor with a BBB A+ grade and 34 years in business. BBB identifies the company as a general engineering contractor, and state records show an electrician license that expired on July 31, 2022. The available public material documents Olson Electric Development Co., Inc. as the preparer or applicant for Methuen Falls hydroelectric project reports and applications. Those records establish local project involvement and an engineering/electrical context, but they do not provide customer reviews or firsthand accounts to evaluate workmanship, communication, or current service. Before booking, confirm the current licensing position and ask for recent references or project examples. This looks like a better fit for an owner seeking specialized electrical or engineering work tied to infrastructure than for someone relying on a broad residential review history.
Typical Greater Boston range for this kind of work, from regional averages — not a quote from Olson Electric Development Co. Use it to sanity-check bids, then get the real number in writing.
Standard receptacle swaps — a new dedicated circuit is a bigger job ($350–$750).
Flush mounts, pendants, chandeliers — hung on existing boxes.
Estimated range
$530 – $1,100
Typical electrical project around $820
“Olson Electric Development Co., Inc. (“OED”).”
“Prepared For: Olson Electric Development Co., Inc. 30r Hampshire Street Methuen, MA 01844 Submitted By: Normandeau Associates, Inc. 25 Nashua Road Bedford, NH 03110 R – 23057.000 October, 2012 ... Falls Bypass Flow Report –”
“Prepared by: Olson Electric Development Co., Inc. Methuen MA”
“Application Reviewer: Diane Barr, Camas, LLC This report provides review findings and recommendations related to the application submitted to the Low Impact Hydropower Institute (LIHI) on February 19, 2019 from Olson Electric Development Co., Inc. (Applicant) for Low Impact Hydropower Recertification of the Methuen Falls Hydroelectric Project (the Project). ... . LIHI ... Stage II ... Stage II Rec ... revised Recertification ... on FERC e ... library posted since ... were reviewed. ... was not complete as ... Fisheries and Wildlife were ... IV. There have not been any “material changes” at the”
Specializes in
Also offers
Service area
Languages
2 changes recorded — last scanned Sep 11, 2026.
Storm response4.3
Complex panel upgrades3.7
87 electrical permits on file3.4
State-verified active electrician license3.2
201 projects and 23 permits filed in three years3.2