Drainage and grading that fixes puddling5.0
Parking area designed with the owner3.2
Crushed-rock base under two top coats4.0
A 1993 driveway that lasted 32 years4.9
Driveway widening with careful leveling and pitch3.7
Driveway replaced start to finish in one day3.5
Creative fixes when a driveway plan changed3.4
Own asphalt and aggregate plants1.3
Steep driveway re-graded and re-paved3.0
Deep tear-outs and solid driveway bases3.8
Driveway paving4.0
Resurfacing offered instead of a full repave4.1
Driveway resurfacing3.3
Driveway ripped out, re-graded and laid new4.0
You’ve seen all 14 paving contractors seen on Reddit
14 of 14 results shown