Counter installed three days after the estimate3.9
Flexible on changed plans4.7
Bathrooms, doors, stairs and painting finished4.4
Old duplex walls restored, cracks gone3.8
Surface preparation3.6
Storm door installed in three days4.6
Bathroom restoration3.7
Trex deck construction4.2
Thorough deck preparation4.2
Glued-down floors sanded and refinished3.5
Sheetrock ceiling repair3.5
60 of 235 results shown