Dryer placement advice3.9
Painting of Hardy Plank siding and Azek trim4.9
Popcorn ceiling refinish4.3
Wallpaper installed in several rooms4.5
Radon levels brought down to under 14.5
Stucco estimates that proved 90%+ accurate4.8
Lead paint handled carefully4.3
Cabinet refinishing with sprayed cabinet enamel3.6
Mold treatment done within a 48-hour turnaround3.9
Small cutting job finished in half an hour3.3
Each project completed on time3.9
Leak-damaged ceilings restored4.6
Bowing vinyl gutters replaced4.2
Iron railings installed on two sets of stairs3.0
Siding and rot repair3.9
Flooded basement put back together4.1
Prep that protected furniture and floors3.9
60 of 132 results shown