Driveway sealcoat still looking good five years later3.2
Septic repair3.6
Driveway work a 2021 customer praised2.2
Grass edged and cracks cleared of debris before sealing4.9
Driveway pitch that handled several rain storms4.8
Driveway edged, crack-filled and sealed4.1
Fast town approvals3.8
Runoff fixed so rain no longer pools at the foundation3.7
New drainage installed after a building backup3.8
Driveway preparation3.6
Permitted apron dig right to the road3.1
Topsoil and grading to level a yard4.4
Driveway durability3.8
Repeat driveway work3.6
Drainage fixes suggested for puddle spots2.2
Walkway replacement work3.9
Tile roof washed clear of moss4.0
Detailed contract with a hand sketch and scope4.3
Driveway paving3.6
Basement waterproofing in an old West Hartford home3.9
Driveway replacement, expansion and new-driveway paving4.0
Driveway runoff testing3.9
Driveway layout by Justin at a fair price3.1
State-verified Home Improvement Contractor license since 20112.0
Crew minded lawn and sidewalk during tear-out4.0
Garage joint sealed with hot-pour sealant4.0
Drainage problems fixed on a large project3.6
Driveway drainage3.5
Driveway drainage and topsoil grading3.6
Driveway drainage3.9
Sealcoating with not one accidental smear3.7
Came out on short notice for an estimate3.0
Completed fence work2.9
Driveway seal coating3.7
Paver patios3.4
Tim on site the whole time during the driveway job3.7
Responsive project team3.7
Patio block work2.7
Sewer line replaced in four days4.0
Clear communication3.6
Driveway drainage with no puddling afterward3.6
Water service restoration3.8
Driveway cracks filled and low spots leveled3.6
A driveway praised ten years after paving3.2
Driveway replaced in one day3.7
Parking lot patching3.7
Drainage follow-up3.2
A 2025 customer's word for the crew: hard workers3.3
Driveway still in good condition after 37 years2.4
Driveway drainage and water issues resolved2.4
Four-day lot job with asphalt reclaiming3.6
Lot striping quoted and lined the same day3.1
Driveway tear-up and repave fit to the budget2.9
Redone driveway with a praised end result2.9
Concrete dumpster pad with no cracks or crumbling2.8
Drainage system replaced, no flooding after heavy rain3.7
Seven years of repeat driveway paving for one customer2.8
Quick scheduling2.9
Paver patio over 700 square feet in a week3.8
Hot rubber crack filling before a full seal coat3.2
60 of 82 results shown