What does carpentry work cost in Buxton? See typical prices →
Decks, drywall, doors and ceilings fixed in one visit list3.6
Siding repair that included a rotted wall rebuild4.0
Crawl-space access door cut through concrete4.0
Elevated deck with the entry door raised half a story3.4
Stair treads made to match refinished floors3.7
Built a sprung dance floor for a studio3.5
Walnut wet bar cabinetry fitted to an awkward wall4.1
Kitchen cabinets and island with crown installed3.0
Years of roof moss removed4.0
2025 StairCraft award for Best Curved Stairway4.2
Wrap-around deck built as the owner envisioned3.1
Attic bedroom finished ahead of schedule4.0
Discontinued window sill covers milled from CAD designs3.8
Drop cloths down daily to contain dust3.1
Antique rocker runner matched perfectly3.7
Custom woodwork: furniture and installed wood elements3.4
Mentioned 1× around the local web3.6
Organized, punctual kitchen renovation3.6
Stair replacement done in a timely manner3.7
130 years in business3.1
Kitchen subfloors, linoleum and full trim replaced3.7
Old-house work from a carpenter who knows antique homes3.7
Fiberglass shower swapped for a tiled enclosure4.1
Rotting deck wood replaced with a fast turnaround3.6
Flagged hidden rot problems instead of covering up3.4
Quick turnaround: a building project done in about seven days3.6
Rehired for repeat work on a family's apartments3.0
Mentioned 1× around the local web3.5
42 years in business3.6
Old deck torn down and rebuilt in composite3.9
Ramp rebuilt in two days3.9
Rebuilt a falling-down garage3.2
Rotten deck boards and loose railing fixed3.0
Business build-out taken to ready-to-open3.2
Heads-up on any schedule changes from Todd3.1
Mentioned 3× around the local web3.5
Custom staircase built to a loft3.1
Timber frame designed and installed by Michael3.8
Back deck built from a customer's basic drawing3.5
Structural rebuild after leaking-window damage4.0
Basement refinish on schedule and on budget3.5
Custom built-in made for a home3.1
Lasting drawer work, still working after a decade2.9
Garage built after an earlier shed job3.5
Basement turned into a kids' playroom3.8
Finished ahead of schedule and under budget3.5
Full design drawings before the contract3.2
Full-house Hardie board re-side3.6
Floors and stairs redone in a 1700's home3.5
Tub swapped for a walk-in shower3.9
Old door fitted to an out-of-square frame3.6
Deck rebuilt and wrapped in composite, sunroom included3.3
Mentioned 3× around the local web3.6
Attic space finished into a bedroom3.1
Bathroom build-out with heated floors and a relocated toilet3.9
Basement window replacement with gravel wells3.4
Saturday and evening hours when needed3.8
4 years in business3.0
Careful, unhurried prep work on house projects3.7
Backyard graded to a 2% slope3.2
60 of 82 results shown