Rotted wood replaced before priming4.6
Condo repaint done in just two days4.8
Cedar siding restoration with wood replacement5.0
Whole home interior painted in one day4.9
Owner Demir on site each day4.8
Drywall finish praised by other contractors4.1
Cabinet refinishing4.4
Colonial exterior repaint in under a week4.0
Seamless patching of new wood into older floors4.9
Crew cleaned up every day before leaving3.2
Roof replacement finished on time4.0
Deck restored to like-new condition3.3
Tile-to-plank job finished under the quote4.0
Estimate at 10 am, work started by 2 pm4.2
Fire rebuilds4.2
EIFS stucco repair4.2
Whole-house rebuild after a fire4.4
Chimney flashing leak traced and stopped4.1
Kitchen color strip added for contrast3.1
Ceiling drywall repair that finished invisible3.1
On-schedule bathroom build3.6
Basement floor rebuilt in three days4.0
60 of 77 results shown