Whole home interior painted in one day4.9
Pillars and trim repainted on a historic New Haven house5.0
Three full days of careful prep work4.3
Trim, siding and soffit carpentry alongside the paint4.6
Deck staining5.0
Crew cleaned up every day before leaving3.2
Roof replacement finished on time4.0
Charged what they said they would4.1
Roof estimate held to the penny4.7
Fire rebuilds4.2
Old-house carpentry on rot, shakes and porch rebuilds4.6
Deck restored to like-new condition3.3
Harder jobs finished at no extra charge4.1
Old-house prep4.0
Kitchen color strip added for contrast3.1
Exterior staining finished in a few days4.1
Flood-damaged basement rebuild with cost updates4.6
Whole-house rebuild after a fire4.4
Estimate at 10 am, work started by 2 pm4.2
Walk-in shower with niche, bench and glass door4.9
Two-level Trex deck build3.7
Everything taped and covered before the work4.0
Chimney flashing leak traced and stopped4.1
EIFS stucco repair4.2
Lead paint handled carefully4.3
On-schedule bathroom build3.6
60 of 314 results shown