Generator install that left the house cleaner4.2
Generator installs with permits and inspections secured4.0
Solar hookup joining arrays on two separate roofs4.3
Propane hookups for garage heaters and a generator4.2
100-year-old wiring problem fixed quickly3.6
Red maple pruned of dead and diseased wood3.9
Baseboard heating set up for a finished basement3.8
Came through on last-minute service calls many times3.9
Full tear-out of a 35-year-old driveway4.1
Attic bedroom finished ahead of schedule4.0
Walkway on two base layers, done in 2.5 days4.0
Owner on site within twenty minutes of the call3.9
Whole-property upkeep from power washing to mowing3.7
Roof finished between 7:30am and 11am4.1
Poolside patio and planters by David3.9
Reroof finished within three days3.9
Tree safety advice for a campground3.9
Sunday-night callback from Jeff3.7
Fixture replacement: sinks, toilets and showers3.9
Bluestone patio on a client's third project4.1
Kitchen job brought back on track by Brandon4.2
Small kitchen remodeled in 10 hours3.8
Drainage project Jamie saw through to completion3.8
Total on-site assessment of what was needed3.7
Efficiency Maine rebates submitted for the customer4.0
Patio install plus cedar tree transplants3.8
Years of roof moss removed4.0
Replacement garage doors that run quiet3.7
House, garage and barn restained in days4.1
Last-minute 26 ft truck unload in two hours3.8
Third of a basement cleared out3.7
Sanding dust kept contained during a refinish4.3
About a month tick-free after each treatment3.8
Year-round care from mowing through plowing3.8
Photo eye repaired instead of replaced3.9
Booked for the very next day3.9
A careful sort that pointed out items of value3.9
Added branches cut without an extra bill3.9
Served one household for nine years3.7
Original quote held despite a larger load4.0
Condo install planning for a building's mini-splits3.8
Money-saving options noted by Colby3.8
Shawn came the same day he was called about an outage3.6
Burst pipe fixed within 24 hours3.8
Ryan brainstorms the design until it is right3.9
Hardscape finished to match the detail renderings3.6
Saturday callback to reset a lifter pump3.6
Worksite left spotless when the job was done4.1
Septic tank install with a clean site after4.0
Takes on small jobs others refused3.5
Eroding slope held with no signs of erosion3.7
Piano move at one-fifth the next bid3.9
Burst tank repair with a new tank by noon4.0
Five rooms finished in three days4.0
Quartzite fabricated and sealed by Derek3.9
Walk-in fridge and freezer repair3.4
Bathroom gut remodel in a nearly 150-year-old building3.4
Diagnosis and repair done within an hour or two3.8
Six years of home upkeep in every season3.8
Fixed another company's botched roof, twice3.9
60 of 2,638 results shown