What does a bathroom remodel cost in Greater Portland? See typical prices →
Gutted bathrooms rebuilt from scratch4.3
Sunday-night leak handled by morning3.8
Small kitchen remodeled in 10 hours3.8
Old-house plumbing fixes others called impossible3.9
Bathroom gut remodel in a nearly 150-year-old building3.4
Basement storage turned into a kid play space4.1
Attic bedroom finished ahead of schedule4.0
Takes on small jobs others refused3.5
Help choosing complementary flooring and tile3.3
Six-month home build that ran through the winter3.7
Two bathrooms gutted and renovated3.9
Kitchen and bath designed by Diana3.8
Cabinet layout ideas a customer hadn't considered4.0
Indoor renovations finished before Christmas guests arrived3.7
Second-story addition built above a garage3.6
Bathroom remodel with new tile, electrical and plumbing3.9
New deck and porch on a 1966 house4.0
Fiberglass tub/shower replaced with tile and grab bar4.1
Tub-to-walk-in shower conversion3.9
Old sill replaced with a new pressure treated one3.1
Furnace replacement3.9
Basement finish kept on its timeline3.8
Kitchen remodel with opened walls and relocated appliances3.5
Bathroom remodel with new joists, subfloor and plumbing4.0
Fiberglass shower swapped for a tiled enclosure4.1
Garage turned into living space plus a new garage3.8
Living room addition that blends with a ranch house3.5
Deck rebuilt and wrapped in composite, sunroom included3.3
Help renovating both bathrooms for one customer3.8
700 square feet of attic turned into living space4.0
Cathedral ceiling built in place of a flat one4.0
Kitchen layout reworked for ocean views3.1
Change costs in time and money stated before work3.8
Bathroom and kitchen remodeled by Simeon3.3
Warranty replacement of an almost 25-year-old unit2.6
Design, 3D visual and estimate at no fee4.0
Bathroom build-out with heated floors and a relocated toilet3.9
Coastal summer home built by the Leddy team3.6
Kitchen renovation finished three days early4.0
Tub swapped for a walk-in shower3.9
Elevated deck with the entry door raised half a story3.4
Saturday and evening hours when needed3.8
Bathroom remodel with a smooth process3.6
Rotten deck boards and loose railing fixed3.0
22 years in business3.5
Basement paint job redone at his own cost3.6
Original fixtures kept on his advice2.3
Custom shower installations3.0
Old deck torn down and rebuilt in composite3.9
Railing installation, smooth from start to finish3.6
Basement converted to bedroom, bathroom and closet3.6
House readied for sale, looking much better3.3
Bathroom job that came in at budget2.1
64 years in businessNot yet rated
18 years in businessNot yet rated
8 years in businessNot yet rated
27 years in businessNot yet rated
30 years in businessNot yet rated
73 years in businessNot yet rated
20 years in businessNot yet rated
60 of 78 results shown