Rotten wood caught before painting
Custom woodwork3.4
Doors and trim4.2
Screened sun porch and designed decks3.4
Heavily built decks and solid railings3.7
Custom desk construction3.9
Finished in the quoted 10 days4.2
Cabin build finished ahead of schedule3.5
Back porch rebuild4.1
Kitchen remodeling3.7
Deck construction3.7
Garage repairs3.2
Custom home construction3.7
Cedar siding and steps4.2
Attention to painting detail4.0
Three-season porch and deck built together3.2
Hour-long crawl space evaluation3.1
Timely tub-to-shower conversion3.6
Roof and deck replacement4.2
Interior painting2.7
Basement overhaul3.8
Paint-ready wall hole repairs4.0
Custom built-ins3.1
Bath and kitchen remodels3.5
Second-floor bathroom build3.2
Carpentry team2.0
60 of 102 results shown