Whole-house LVP in a day and a half
Dust contained with barriers and tape4.8
80-year-old hardwood floors refinished4.8
Hardwood and vinyl floor repairs and installs5.0
Return visit to resand a damaged area4.6
Invisible board replacement4.2
Floor lightening that brightened every room4.5
Reinstalled a homeowner's faulty hallway floor3.9
Kitchen floor install with each step explained4.2
Upstairs and stairs carpeted in 2 days4.4
Claudio sanded and stained half the house4.1
Damaged hardwood replaced and stained4.4
Handles condo HOA approvals for renovations4.7
Hardwood refinishing with every step explained3.9
Two walk-in curbless showers tiled3.8
Quoted within 90 minutes of calling4.4
Finish samples laid down to choose the look3.8
Historic floor refinishing4.2
Original 1965 floors refinished to look new3.6
Deck builds, rebuilds and repairs4.4
Discontinued siding boards matched on a reproduction Cape5.0
Clay tile roof repair4.1
Shower gap fixed after a drawn-up plan4.2
House painted eight days after the estimate call4.2
Water-damaged home gutted and renovated4.3
Subfloor repair that kept the original timeline3.7
Tile set true on walls where nothing was plumb3.9
Bathroom waterproofing done properly4.8
1,100 sq ft of hardwood installed in 3 days4.1
Bathroom remodel finished ahead of schedule3.9
60 of 317 results shown