Rotten wood caught before painting4.7
Porch built ahead of schedule3.4
Custom woodwork3.4
Finished in the quoted 10 days4.2
Doors and trim4.2
Cabin build finished ahead of schedule3.5
Deck installation4.0
Screened sun porch and designed decks3.4
Three-season porch and deck built together3.2
Back porch rebuild4.1
Kitchen remodeling3.7
Deck construction3.7
Cedar siding and steps4.2
Custom home construction3.7
A dozen repairs finished, plus added ones3.6
Garage repairs3.2
Paint-ready wall hole repairs4.0
Custom built-ins3.1
Interior painting2.7
Second-floor bathroom build3.2
60 of 91 results shown