Varnished bedroom floor held up 10 years4.2
Well-prepped floor refinishing4.1
Custom problem-solving4.8
Basement remodels3.7
Wide-ranging repairs4.8
Rotted wood deck replaced with composite4.5
Blank space converted into a full bathroom4.2
Same-day estimate, work started the next morning4.0
Prefers to repair items rather than replace them4.1
Restored c.1900 hardwood floors3.0
Window installation3.9
Callback in under 10 minutes4.1
Old garage converted into a den3.6
Whole-house repaints4.6
Kitchen fill-in: cabinets, flooring and painting3.2
Front door with sidelights replaced3.2
60 of 188 results shown