Rotten wood caught before painting
Custom woodwork3.4
Doors and trim4.2
Screened sun porch and designed decks3.4
Custom desk construction3.9
Back porch rebuild4.1
Finished in the quoted 10 days4.2
Cabin build finished ahead of schedule3.5
Porch built ahead of schedule3.4
Garage repairs3.2
Kitchen remodeling3.7
Deck construction3.7
Attention to painting detail4.0
Custom home construction3.7
A dozen repairs finished, plus added ones3.6
Cedar siding and steps4.2
Hour-long crawl space evaluation3.1
Three-season porch and deck built together3.2
Roof and deck replacement4.2
Timely tub-to-shower conversion3.6
Basement overhaul3.8
Paint-ready wall hole repairs4.0
Bath and kitchen remodels3.5
Custom built-ins3.1
Interior painting2.7
Second-floor bathroom build3.2
Carpentry team2.0
60 of 116 results shown