What does a bathroom remodel cost in Lee? See typical prices →
Daily attendance on a basement project3.9
Bathroom renovation in an old home3.5
Kitchen finished after another contractor left3.3
Propane furnace fix done in under an hour4.3
Quick scheduling for a cracked tub: two days out3.3
In-law cottage addition management4.9
Coordinates electricians and plumbers for you4.3
Cabinetry fit that impressed the installing contractor4.3
Built-in cabinets and dressers4.5
Basement bathroom addition, finished in a timely fashion3.5
Bathroom renovations4.4
Basement rebuilds and leak restoration4.4
Kitchen gut renovation kept to timeline and budget3.7
Bathroom redone from floor to ceiling4.4
Bathroom remodel with a walk-in shower4.1
Fast response4.3
Tub-to-shower conversions done in one day4.3
Tub and shower job done in 3.5 days4.0
Mobile home underbelly repair with new vapor barrier4.0
Worked Sundays to meet a tight remodel deadline3.2
Builder hired and overseen for the homeowner3.4
Front stairs rebuilt and brick steps repaired4.1
Basement rebuild3.6
Kitchen backsplash finished in one day3.7
Upstairs bathroom remodel at a very reasonable quote3.2
Bathroom redo praised as affordable4.1
Ceiling repair from sheetrock to paint4.3
Bathroom remodels4.4
Garage with in-law apartment3.5
Garage conversion with three bedrooms and a bathroom4.3
Bedroom and bathroom home addition3.8
Customer ideas turned into a workable layout3.1
Fixer-upper overhaul: drywall, bath, kitchen, structural3.7
Bonus room dormer planned with an architect4.4
Bathroom renovations4.1
Porch footings hand-dug and replaced with concrete4.1
One-day punch list4.1
Sunday call answered within a half hour4.1
Kitchen design built around the customer's goals4.1
First-floor gut remodel with new floors, tile and island3.8
Hands-on demolition and carpentry by Eric himself4.2
Screened in porch4.1
Herringbone tile and bedroom hardwood4.0
Trex deck finished on time and on budget3.5
Two decades of projects in one Exeter home3.5
Design-build process with in-house designers4.0
One-day installs3.8
Burst pipe fixed after a 30-minute arrival3.9
Business renovation brought a customer’s vision to life3.6
Marble shower stall installation3.8
Fast hardwood floor install in manufactured oak3.8
Siding, windows, doors and roof in one renovation3.9
38 years in business2.9
Tub resurfacing finish that held up for 10 years3.4
40 years in business3.6
Wallpaper removed from horse hair plaster4.1
25 years in business3.6
Cabinet addition matched to old uneven floors3.3
Oak stair remodel with new railings4.1
Deck rebuilds with corrected framing3.1
60 of 88 results shown