What does a bathroom remodel cost in Barrington? See typical prices →
Quick scheduling for a cracked tub: two days out3.3
Bedroom and bathroom home addition3.8
Three-season room that became a customer's favorite room2.8
Problem diagnosed and fixed in under an hour3.6
Bathroom remodel in an 1865 home4.3
Bathroom remodel with a walk-in shower4.1
Bathroom redone from floor to ceiling4.4
Bathroom renovations4.4
Daily attendance on a basement project3.9
Coordinates electricians and plumbers for you4.3
Bathroom redo praised as affordable4.1
Tub-to-shower conversions done in one day4.3
Basement bathroom addition, finished in a timely fashion3.5
Garage conversion with three bedrooms and a bathroom4.3
Worked Sundays to meet a tight remodel deadline3.2
Tub and shower job done in 3.5 days4.0
Kitchen gut renovation kept to timeline and budget3.7
Customer ideas turned into a workable layout3.1
Basement water cleared after Jordan came right out4.6
Ceiling repair from sheetrock to paint4.3
Mobile home underbelly repair with new vapor barrier4.0
Front stairs rebuilt and brick steps repaired4.1
Business renovation brought a customer’s vision to life3.6
Kitchen backsplash finished in one day3.7
Builder hired and overseen for the homeowner3.4
Bathroom renovation in an old home3.5
Basement rebuild3.6
Herringbone tile and bedroom hardwood4.0
Upstairs bathroom remodel at a very reasonable quote3.2
Kitchen finished after another contractor left3.3
Heated floors and detailed shower tile work3.7
Burst pipe fixed after a 30-minute arrival3.9
Garage with in-law apartment3.5
Trex deck finished on time and on budget3.5
Bonus room dormer planned with an architect4.4
Bathroom remodels praised for tile and shower work3.6
Jake’s shower-to-tub conversion3.7
Fixer-upper overhaul: drywall, bath, kitchen, structural3.7
One-day punch list4.1
Sunday call answered within a half hour4.1
Screened in porch4.1
Two decades of projects in one Exeter home3.5
Owner picks the tile alongside you3.8
First-floor gut remodel with new floors, tile and island3.8
One-day installs3.8
Design-build process with in-house designers4.0
Marble shower stall installation3.8
Boiler problem help when another provider did not respond3.4
Fast hardwood floor install in manufactured oak3.8
Tub resurfacing finish that held up for 10 years3.4
Siding, windows, doors and roof in one renovation3.9
Temporary office built on short notice after a storm4.0
Oak stair remodel with new railings4.1
38 years in business2.9
40 years in business3.6
25 years in business3.6
Whole-home renovation covering kitchen, bath and flooring4.0
Custom upper and lower vanity cabinetry4.0
New garage finished on time and within budget4.0
Home addition completed on time4.0
60 of 70 results shown