Project cleanup4.2
Walk-in shower installed in place of a tub3.2
Second-story addition4.2
Kitchen remodel matched to a 1920s home3.8
Cellar conversion with a kitchenette3.9
State-verified Home Improvement Contractor license since 2025Not yet rated
Bathroom remodel ten years after the same kitchen4.3
Walk-in shower install4.0
Door installation4.2
Old-house bathroom work4.3
Bath and kitchen remodels3.5
Tub-to-walk-in shower conversion4.0
Flexible on changed plans4.7
Timely tub-to-shower conversion3.6
A 9-day bath remodel4.3
Failing Juliette porch rebuilt4.4
Gut bathroom remodels3.8
Custom woodwork3.4
Finished in the quoted 10 days4.2
Repeat window customer3.8
Shower installs by fast, clean crews3.8
Kitchen flood help4.0
Bathroom transformation3.5
Kitchen and bath work4.0
Master-bathroom remodel3.5
Farmhouse remodel reusing historic chestnut planks3.7
Bathroom and kitchen room renovations3.9
On-time remodel3.3
Basement finishing3.6
Walk-in shower conversion within budget3.9
Same-day water heater, installed by 2:00 pm4.6
Bathroom reconstruction that improved the original plan3.4
Kitchen remodel3.5
Tub reglazing finish that lasted 20 years3.8
Screened sun porch and designed decks3.4
Custom cabinetry3.5
Second-floor bathroom build3.2
60 of 153 results shown