Blank space converted into a full bathroom4.0
Full-scope remodels5.0
Two-bath remodel that kept a working shower3.7
Short-notice ice dam response5.0
Tile marbling lined up from tile to tile4.0
Bathroom rebuilt with a bigger shower area3.2
Windows and siding crew on time every day3.8
Whole-room renovations4.7
Burst-pipe gut rehab4.5
Bathroom remodel finished within the quoted time3.4
Kitchen renovation taken down to the studs4.5
Everything cleaned up after the job3.5
Load-bearing wall opened with an LVL beam4.3
Condo basement finished with 3 rooms and a full bath4.6
Rescued a stalled addition4.1
Bathroom remodel finished in 8 days4.4
Named technicians4.7
Same-day door replacement4.1
Full kitchen and bath jobs3.9
Prefers to repair items rather than replace them4.0
Bathroom remodels3.9
Custom problem-solving4.8
Porch reconstruction5.0
Basement conversion adding offices and closets3.6
Old garage converted into a den3.5
Deck approval legwork3.9
Kitchen repairs3.7
Bathroom remodels3.2
Emergency water heater replacement4.2
Custom built-ins4.3
Licensed plumber4.6
Job finished ahead of the estimated date4.1
60 of 286 results shown