Full-scope remodels5.0
Whole-room renovations4.7
Kitchen renovation taken down to the studs4.5
Load-bearing wall opened with an LVL beam4.3
Two-bath remodel that kept a working shower3.7
Burst-pipe gut rehab4.5
Condo basement finished with 3 rooms and a full bath4.6
Short-notice ice dam response5.0
Named technicians4.7
Full kitchen and bath jobs3.9
Tile marbling lined up from tile to tile4.0
Bathroom remodels3.9
Bathroom rebuilt with a bigger shower area3.2
Bathroom remodel finished within the quoted time3.4
Rescued a stalled addition4.1
Porch reconstruction5.0
Bathroom remodel finished in 8 days4.4
Windows and siding crew on time every day3.8
Bathroom renovations4.5
Everything cleaned up after the job3.5
Licensed plumber4.6
Old garage converted into a den3.5
Job finished ahead of the estimated date4.1
Basement renovations4.4
Same-day door replacement4.1
Prefers to repair items rather than replace them4.0
Bathroom remodels3.2
Custom built-ins4.3
Custom problem-solving4.8
State-registry license3.5
60 of 303 results shown