Painting preparation
Cathedral-ceiling bedroom with thorough prep3.5
Clean, level drop ceiling installs4.9
Basement framing, baseboard and drywall4.4
Renovation touch-ups4.8
Damaged trim and shingles replaced before painting4.3
Thorough prep work4.8
Painting with window-trim and gutter repairs5.0
Thorough deck sanding4.8
Cabinet finish4.8
Cabinet painting4.9
Sanding and wood repairs before painting5.0
Active state licence4.2
Cedar shingle exterior done in 4-5 days4.4
Careful paint preparation4.4
Railing repairs4.8
Whole-house spray painting4.2
Skylight leak assessed within 12 hours4.5
Detailed trim repair4.0
Porch built in under two days4.5
Bathrooms, decks, kitchens and exteriors4.3
Exterior preparation4.3
3 bedrooms repainted in 2 days4.8
House painting that held up over time4.4
Kitchen cabinet painting done on time4.4
Custom woodwork4.6
Photo and video updates while you are away4.0
Replacement windows stopped leaking5.0
Punch-list repairs4.1
Takes over jobs another contractor quit5.0
Rotted dormer trim replaced with PVC5.0
Exterior repaint with wash, sanding and wood replacement3.7
Move-in to-do lists4.3
Careful prep work on every wall4.1
Front porch and fence sanded and painted4.4
Returned overnight to finish a missed install4.6
Cabinet refinishing4.1
A dozen punch-list tasks in four days5.0
60 of 290 results shown