Modular house build in Webster3.9
Power back on within an hour of an outage call3.3
Code updates and cost shown in photos before install4.7
Custom frame fitting5.0
Mass Save weatherization4.9
Detailed roofing work5.0
Two-day roof replacements4.4
Chimney rebuilds with a new crown and stainless cap4.3
Long-run savings advice from Pete5.0
Pool power fault found after other electricians missed it4.3
Inspection report delivered the same night4.4
Sheds and a garage placed on prepped sites4.1
Patios and retaining walls4.9
Storm-damaged service wires reattached quickly4.5
Stone wall completed ahead of schedule4.3
Oak beam replacement4.4
Foundation replacement with the house lifted4.3
Siding, windows and gutters on a whole house in under a week4.8
Inspection flaws ranked by level of risk4.5
Refacing transformed 1950s kitchen cabinets4.1
Hazard troubleshooting that found an electrified barn frame3.5
Septic removed and house tied into town sewer4.8
Flexible on changed plans4.7
Roof replacement completed in a day4.1
Roof replacement with permits pulled4.6
Popcorn ceiling removal4.1
60 of 2,933 results shown