Storm-damaged service wires reattached quickly4.5
Stone wall completed ahead of schedule4.3
Detailed roofing work5.0
Two-day roof replacements4.4
Mass Save weatherization4.9
Long-run savings advice from Pete5.0
Slate roof repairs4.2
Sheds and a garage placed on prepped sites4.1
Patios and retaining walls4.9
Foundation replacement with the house lifted4.3
Septic removed and house tied into town sewer4.8
Modular house build in Webster3.9
Roof replacement with permits pulled4.6
Chimney leak repair that stayed dry5.0
Deck rebuilds4.7
Full kitchen remodels4.3
Paint advice for a 1720s period home4.8
Ice-dam ceiling patched and repainted4.7
Roof replacement completed in a day4.1
PVC trim upgrade at no extra cost4.2
60 of 3,408 results shown