Surface preparation with wallpaper removal and skim coating5.0
Remodeling work4.3
Herringbone tile work5.0
Refinished 35-year-old maple shaker cabinets4.7
Smooth hardwood tie-in to older oak floors5.0
Polyaspartic garage floor coating4.3
Shoring within 48 hours of a tree strike5.0
Clean job sites4.3
Custom carpentry5.0
Epoxy garage floors4.5
Detailed workmanship4.6
Finished basements4.8
Water damage cleanup that saved century-old floors4.6
Moisture-driven job switch with no added charges4.8
76 permitted projects on record5.0
Bathroom problem repair4.7
Moved furniture protected under drop cloths4.5
Custom fireplace mantels and surrounds4.9
Recent trim and cabinet work4.6
Project planning4.0
Deck & stair rebuilds4.6
Vinyl plank install: 450 sq ft in one day3.7
Total kitchen renovation a customer called a showcase4.7
Kitchen design collaboration3.7
Handles the permit process, including a variance4.3
Exact cost breakdown with material receipts4.3
Vinyl floor replacement4.4
Takes odd-shaped kitchens other vendors refused4.4
Detailed workmanship4.8
Bathroom renovated from the floorboards up5.0
Flooring, bathroom and kitchen remodels finished efficiently4.7
Clean workmanship4.4
Deck renovation3.8
Bathroom, kitchen, foyer and hearth tile3.7
Gut bathroom remodels4.7
60 of 368 results shown